Norm

NEN-EN-IEC 61850-4:2011 en

Communicatienetwerken en -systemen voor het automatiseren van krachtinstallaties - Deel 4: Systeem- en projectbeheer

190,20

Over deze norm

Status Definitief
Aantal pagina's 40
Gepubliceerd op 01-07-2011
Taal Engels
This part of IEC 61850 applies to projects associated with process near automation systems of power utilities (UAS, utility automation system), like e.g. substation automation systems (SAS). It defines the system and project management for UAS systems with communication between intelligent electronic devices (IEDs) in the substation respective plant and the related system requirements. The specifications of this part pertain to the system and project management with respect to: - the engineering process and its supporting tools; - the life cycle of the overall system and its IEDs; - the quality assurance beginning with the development stage and ending with discontinuation and decommissioning of the UAS and its IEDs. The requirements of the system and project management process and of special supporting tools for engineering and testing are described.

Details

ICS-code 33.200
Nederlandse titel Communicatienetwerken en -systemen voor het automatiseren van krachtinstallaties - Deel 4: Systeem- en projectbeheer
Engelse titel Communication networks and systems for power utility automation - Part 4: System and project management
Vervangt

Winkelwagen

Subtotaal:

Ga naar winkelwagen